THE CHALLENGE

Our client was developing a Helium basin and needed to process the raw gas production at a central facility to concentrations of 95% or better to meet tolling contracts. The project required design of the facility for the current raw gas production of 2 MMSCFD and provide scalability for increased processing throughout of 4 MMSCFD. The client required expandable trailer filling capacity as the field developed to meet product takeaway. The project timeline incorporated of a phased build approach to meet current processing needs and future expansion plans.

THE SOLUTION

  • Raw inlet gas treatment design to remove water and meet dew point for separation
  • Membrane package specification, evaluation and procurement
  • Future membrane series deployment for enhanced throughput at lowest cost solution
  • Leverage site utility power to handle current and future needs
  • Design of staged compression system for increased loading capacity

SCOPE OF WORK:

  • Process and mechanical design
  • Electrical and automation design
  • Site layout and key plans
  • Major equipment procurement
  • Onsite package evaluation
  • Construction planning